Innovative slope stabilization at the S6: support from PES for difficult terrain
After a short brainstorming session and many measurements on the device, we came up with a plan, which then went into production 1:1 and could be delivered to the construction site after a few days.
The technical inspection, which took place directly after the installation and test operation on the construction site, went off without a hitch.
Services provided by PES:
- Planning
- Production + static calculation
- assembly
- Acceptance
The joint rapid realisation of this project also saved the construction site considerable costs, as no separate lifting equipment was required.
Furthermore, we are well equipped for future projects of this kind.
Once again: Built by PES!